Menu Top
Complete Course of Mathematics
Topic 1: Numbers & Numerical Applications Topic 2: Algebra Topic 3: Quantitative Aptitude
Topic 4: Geometry Topic 5: Construction Topic 6: Coordinate Geometry
Topic 7: Mensuration Topic 8: Trigonometry Topic 9: Sets, Relations & Functions
Topic 10: Calculus Topic 11: Mathematical Reasoning Topic 12: Vectors & Three-Dimensional Geometry
Topic 13: Linear Programming Topic 14: Index Numbers & Time-Based Data Topic 15: Financial Mathematics
Topic 16: Statistics & Probability


Content On This Page
Bills: Components (Usage, Tariff Rates, Fixed Charge, Surcharge, Service Charge) Calculation and Interpretation of Electricity Bill Calculation and Interpretation of Water Supply Bill and other Supply Bills
Problems based on Utility Bill Calculations


Bill Calculations and Interpretation



Bills: Components (Usage, Tariff Rates, Fixed Charge, Surcharge, Service Charge)

Utility bills (like electricity, water, piped gas) and various service bills received by households and businesses are typically composed of several distinct elements. Understanding these components is essential for interpreting the bill amount and managing consumption costs.

Common Components of Bills


  1. Usage / Consumption:

    This is the core component reflecting the actual quantity of the resource or service consumed during a specific billing cycle (usually a month or a quarter). It is the primary determinant of the variable part of the bill.

    • Units: The consumption is measured in standard units relevant to the service provided. For electricity, it's typically measured in kilowatt-hours (kWh), often referred to simply as "units". For water, it's measured in kilolitres (kl) or cubic meters (m³). For piped gas, it might be measured in cubic meters (m³) or sometimes based on energy content like British Thermal Units (BTU) or Megajoules (MJ).
    • Measurement: Consumption is usually determined by reading a meter installed at the customer's premises. The consumption for the period is calculated as the difference between the current meter reading and the previous meter reading:

      $ \text{Consumption} = \text{Current Meter Reading} - \text{Previous Meter Reading} $


  2. Tariff Rates / Energy Charges / Variable Charges:

    This is the price per unit of consumption. The total energy or consumption charge is calculated by multiplying the units consumed by the applicable tariff rate(s).

    • Slab Rates (Tiered Tariffs): Many utilities, especially electricity suppliers, use a tiered or slab-based tariff structure. Under this system, different rates per unit are applied to different consumption ranges. The rate per unit typically increases as consumption moves into higher slabs. This is often designed to encourage conservation and place a higher cost burden on high consumers. For example, the first 'X' units might be charged at Rate A, the next 'Y' units at Rate B (where B > A), and so on.
    • Flat Rate: Less commonly for utilities like electricity or water, a single fixed rate might apply to all units consumed, regardless of the total consumption volume.
    • Time-of-Day (ToD) Tariffs: For some categories of consumers (e.g., industrial, commercial, or even domestic consumers with smart meters), the tariff rate might vary depending on the time of day the consumption occurs (e.g., peak hours versus off-peak hours) or season.

  3. Fixed Charge / Meter Rent / Demand Charge:

    This is a fixed amount charged to the customer regardless of their consumption during the billing period. These charges help the utility recover costs that are not directly related to the amount of energy or water delivered, such as maintaining the distribution network, infrastructure investment, meter maintenance, billing and customer service operations, etc.

    • The fixed charge might be a flat fee per billing cycle or could vary based on the type of connection (e.g., single-phase vs. three-phase electricity), the sanctioned load or contract demand (for electricity or gas connections), or the size of the water meter.
    • Demand Charge: Particularly for larger electricity consumers (commercial or industrial), a demand charge based on the maximum power demanded during the billing period might replace or supplement the fixed charge.
    • Meter Rent: A specific, sometimes separate, fixed charge for the rental or maintenance of the meter itself.

  4. Surcharge / Fuel Adjustment Charge (FAC) / Power Purchase Adjustment Cost (PPAC):

    These are variable charges added to the bill to account for fluctuations in the utility's operational costs, which are often beyond their direct control. The most common example is related to the fluctuating cost of fuel (coal, gas, oil) used for electricity generation.

    • FAC or PPAC is usually calculated per unit of consumption (e.g., $\textsf{₹} 0.50$ per kWh) or as a percentage of the energy charge. It allows utilities to pass on increases or decreases in fuel/power purchase costs to consumers without frequent revisions of the base tariff rates.
    • A general 'surcharge' might also apply for other specific purposes determined by regulatory authorities.

  5. Service Charge / Customer Charge:

    This component is very similar to or sometimes integrated with the Fixed Charge. It is intended to cover the fixed costs of providing service to each customer account, irrespective of usage. It includes costs like billing, customer support, and account management.


  6. Taxes and Levies:

    Various taxes and government levies may be added to the bill amount. These are statutory charges imposed by central, state, or local governments.

    • GST (Goods and Services Tax): While the core consumption of electricity or water by domestic consumers might be exempt from GST, other charges on the bill (like certain fixed charges, rental charges for equipment, or charges for commercial/industrial connections) may attract GST.
    • Electricity Duty: A state-level tax levied on electricity consumption, often calculated as a percentage of the energy charge or a fixed rate per unit consumed.
    • Water Cess: Similar to electricity duty, a cess or tax on water consumption in some regions.

  7. Arrears / Previous Balance:

    Any unpaid amount from previous billing periods is added to the current bill. This ensures that outstanding dues are carried forward.


  8. Late Payment Surcharge (LPSC):

    A penalty or additional charge levied if the bill is not paid by the specified due date. It is usually calculated as a percentage of the outstanding amount or at a specified rate per month/day.


  9. Rebates / Subsidies:

    These are reductions applied to the bill amount. Rebates might be offered for timely payment or for specific categories of consumers. Subsidies are often provided by the government to reduce the cost burden on certain consumer groups (e.g., rural households, low-income families) or for specific consumption levels (e.g., free electricity up to a certain number of units). These amounts are deducted from the total calculated charges.


The final amount payable on a bill is the sum of all applicable charges (Energy, Fixed, Surcharges, Taxes, Arrears, LPSC) less any applicable Rebates or Subsidies.


Calculation and Interpretation of Electricity Bill

Key Components of an Electricity Bill

An electricity bill is a statement detailing the cost of electricity consumed over a billing period. The main components contributing to the final amount are:



Calculation Steps (Illustrative Example)

Let's illustrate the calculation process using a hypothetical example based on slab rates. Note that actual rates and charges vary significantly by state and utility provider in India.


Illustrative Tariff Slab Structure for Domestic Consumers:

Consumption Slab Rate per kWh
0 - 50 kWh $\textsf{₹} 3.00$
51 - 150 kWh $\textsf{₹} 4.50$
151 - 300 kWh $\textsf{₹} 5.50$
Above 300 kWh $\textsf{₹} 6.50$

Assume the following additional charges:


Scenario: A consumer has a monthly consumption of 250 kWh.


  1. Calculate Consumption:

    Consumption = 250 kWh (Given)


  2. Calculate Energy Charge (using Slab Rates):

    The total consumption of 250 kWh falls across the first three slabs.

    • First 50 kWh @ $\textsf{₹} 3.00$/kWh: $50 \text{ kWh} \times \textsf{₹} 3.00/\text{kWh} = \textsf{₹} 150.00$
    • Next 100 kWh (from 51 to 150) @ $\textsf{₹} 4.50$/kWh: $(150 - 50) \text{ kWh} \times \textsf{₹} 4.50/\text{kWh} = 100 \text{ kWh} \times \textsf{₹} 4.50/\text{kWh} = \textsf{₹} 450.00$
    • Remaining 100 kWh (from 151 to 250) @ $\textsf{₹} 5.50$/kWh: $(250 - 150) \text{ kWh} \times \textsf{₹} 5.50/\text{kWh} = 100 \text{ kWh} \times \textsf{₹} 5.50/\text{kWh} = \textsf{₹} 550.00$

    Total Energy Charge = Sum of charges from each slab

    $ \textsf{₹} 150.00 + \textsf{₹} 450.00 + \textsf{₹} 550.00 = \textsf{₹} 1150.00 $


  3. Calculate Fixed Charge:

    Fixed Charge = $\textsf{₹} 100.00$ (Given as a fixed monthly amount)


  4. Calculate Fuel Adjustment Charge (FAC):

    FAC = Consumption $\times$ Rate per kWh

    $FAC = 250 \text{ kWh} \times \textsf{₹} 0.75/\text{kWh} = \textsf{₹} 187.50$


  5. Calculate Electricity Duty:

    Electricity Duty = 6% on Energy Charge

    $Duty = 6\% \times \textsf{₹} 1150.00 = \frac{6}{100} \times 1150 = 0.06 \times 1150 = \textsf{₹} 69.00$


  6. Calculate Total Bill Amount (before arrears/rebates):

    Total Bill = Energy Charge + Fixed Charge + FAC + Electricity Duty

    Total Bill = $\textsf{₹} 1150.00 + \textsf{₹} 100.00 + \textsf{₹} 187.50 + \textsf{₹} 69.00$

    Total Bill = $\textsf{₹} 1506.50$


  7. Add Arrears / Deduct Rebates (Not applicable in this example):

    Final Amount Payable = Total Bill + Arrears - Rebates/Subsidies

    Final Amount Payable = $\textsf{₹} 1506.50 + \textsf{₹} 0 - \textsf{₹} 0 = \textsf{₹} 1506.50$


The estimated electricity bill for a consumption of 250 kWh, based on these hypothetical rates, would be $\textsf{₹} 1506.50$.


Interpretation of an Electricity Bill

Interpreting your electricity bill involves understanding the information provided and how it relates to your consumption and the tariff structure. A typical electricity bill will include:


By carefully reviewing these details, consumers can:



Calculation and Interpretation of Water Supply Bill and other Supply Bills

Components of a Water Supply Bill

Similar to electricity bills, water supply bills are typically made up of several distinct charges that contribute to the total amount payable. These bills reflect the cost of supplying clean water to premises and managing wastewater.


The total amount payable on a water bill is generally the sum of the Water Charge, Fixed Charge, Sewerage Charge, Taxes, Arrears, and LPSC, minus any applicable rebates or subsidies.


Calculation Steps for a Water Bill (Illustrative Example)

Let's walk through a typical calculation process for a water bill based on hypothetical slab rates.


Illustrative Water Tariff Slab Structure (Monthly):

Consumption Slab Rate per kl
0 - 10 kl $\textsf{₹} 5.00$
11 - 20 kl $\textsf{₹} 10.00$
Above 20 kl $\textsf{₹} 20.00$

Assume the following additional charges:


Scenario: A household has a monthly consumption of 25 kl.


  1. Calculate Consumption:

    Consumption = 25 kl (Given)


  2. Calculate Water Charge (using Slab Rates):

    The total consumption of 25 kl falls across all three slabs.

    • First 10 kl @ $\textsf{₹} 5.00$/kl: $10 \text{ kl} \times \textsf{₹} 5.00/\text{kl} = \textsf{₹} 50.00$
    • Next 10 kl (from 11 to 20) @ $\textsf{₹} 10.00$/kl: $(20 - 10) \text{ kl} \times \textsf{₹} 10.00/\text{kl} = 10 \text{ kl} \times \textsf{₹} 10.00/\text{kl} = \textsf{₹} 100.00$
    • Remaining 5 kl (from 21 to 25) @ $\textsf{₹} 20.00$/kl: $(25 - 20) \text{ kl} \times \textsf{₹} 20.00/\text{kl} = 5 \text{ kl} \times \textsf{₹} 20.00/\text{kl} = \textsf{₹} 100.00$

    Total Water Charge = Sum of charges from each slab

    $ \textsf{₹} 50.00 + \textsf{₹} 100.00 + \textsf{₹} 100.00 = \textsf{₹} 250.00 $


  3. Calculate Fixed Meter Rent:

    Fixed Meter Rent = $\textsf{₹} 50.00$ (Given)


  4. Calculate Sewerage Charge:

    Sewerage Charge = 60% of Total Water Charge

    $Sewerage \text{ } Charge = 60\% \times \textsf{₹} 250.00 = \frac{60}{100} \times 250 = 0.60 \times 250 = \textsf{₹} 150.00$


  5. Calculate Total Bill Amount:

    Total Bill = Water Charge + Fixed Meter Rent + Sewerage Charge

    Total Bill = $\textsf{₹} 250.00 + \textsf{₹} 50.00 + \textsf{₹} 150.00 = \textsf{₹} 450.00$


Based on these hypothetical rates, the total water bill amount for a consumption of 25 kl would be $\textsf{₹} 450.00$.


Other Supply Bills (e.g., Piped Natural Gas - PNG)

Bills for other essential utility services like Piped Natural Gas (PNG) supplied to homes and businesses follow a similar billing structure based on consumption and various charges.


The calculation involves determining the consumption, applying the slab rates to calculate the volumetric charge, adding the fixed charges and taxes, and accounting for any previous dues or adjustments.


Interpretation of Utility Bills

Interpreting any utility bill, whether for water, electricity, or gas, involves understanding the key information presented:


Proper interpretation enables consumers to budget effectively for utility expenses, conserve resources, and verify the correctness of the billed amount.


Problems based on Utility Bill Calculations

Examples on Utility Bill Calculations

Example 1 (Electricity Bill Calculation). Calculate the electricity bill amount for a month based on the following details for a domestic consumer:

  • Previous Meter Reading: 5240 kWh
  • Current Meter Reading: 5590 kWh
  • Tariff Slabs:
    • 0-100 units: $\textsf{₹} 3.50$ / unit
    • 101-300 units: $\textsf{₹} 5.00$ / unit
    • Above 300 units: $\textsf{₹} 6.50$ / unit
  • Fixed Charge: $\textsf{₹} 120$ per month
  • Electricity Duty: 5% on Energy Charge
  • Assume no other charges, arrears, or rebates.

Answer:

Given:

  • Previous Meter Reading = 5240 kWh
  • Current Meter Reading = 5590 kWh
  • Tariff Slabs and Rates as provided.
  • Fixed Charge = $\textsf{₹} 120$
  • Electricity Duty = 5% on Energy Charge

Step 1: Calculate Consumption

Consumption = Current Meter Reading - Previous Meter Reading

$Consumption = 5590 \text{ kWh} - 5240 \text{ kWh} = 350 \text{ kWh}$

Consumption = 350 units

... (i)


Step 2: Calculate Energy Charge (using Slab Rates)

The total consumption of 350 units needs to be broken down according to the tariff slabs:

  • First 100 units are charged at $\textsf{₹} 3.50$ per unit.
  • $100 \text{ units} \times \textsf{₹} 3.50/\text{unit} = \textsf{₹} 350.00$

  • The next slab is from 101 units to 300 units. This range covers $300 - 100 = 200$ units. These 200 units are charged at $\textsf{₹} 5.00$ per unit.
  • $200 \text{ units} \times \textsf{₹} 5.00/\text{unit} = \textsf{₹} 1000.00$

  • The remaining units are above 300 units. Total consumption is 350 units. Units charged in previous slabs are $100 + 200 = 300$ units. Remaining units = Total Consumption - Units in previous slabs

    $Remaining \text{ units} = 350 \text{ units} - 300 \text{ units} = 50 \text{ units}$

    These 50 units are charged at $\textsf{₹} 6.50$ per unit.

    $50 \text{ units} \times \textsf{₹} 6.50/\text{unit} = \textsf{₹} 325.00$

Total Energy Charge = Sum of charges from each slab

$Total \text{ } Energy \text{ } Charge = \textsf{₹} 350.00 + \textsf{₹} 1000.00 + \textsf{₹} 325.00 = \textsf{₹} 1675.00$

Total Energy Charge = $\textsf{₹} 1675.00$

... (ii)


Step 3: Add Fixed Charge

Fixed Charge = $\textsf{₹} 120.00$ (Given)


Step 4: Calculate Electricity Duty

Electricity Duty is 5% on Energy Charge.

$Electricity \text{ } Duty = 5\% \times \text{Total Energy Charge}$

$Electricity \text{ } Duty = 0.05 \times \textsf{₹} 1675.00$

$0.05 \times 1675.00$

$\begin{array}{ccccccc}& & & 1 & 6 & 7 & 5 \\ \times & & & 0 & . & 0 & 5 \\ \hline & & & 8 & 3 & . & 7 & 5 \\ \hline \end{array}$

Electricity Duty = $\textsf{₹} 83.75$

... (iii)


Step 5: Calculate Total Bill Amount

Total Bill = Energy Charge + Fixed Charge + Electricity Duty

$Total \text{ } Bill = \textsf{₹} 1675.00 + \textsf{₹} 120.00 + \textsf{₹} 83.75$

$1675.00 + 120.00 + 83.75$

$\begin{array}{ccccc} & 1 & 6 & 7 & 5 . 00 \\ & & 1 & 2 & 0 . 00 \\ + & & & 8 & 3 . 75 \\ \hline & 1 & 8 & 7 & 8 . 75 \\ \hline \end{array}$

Total Bill = $\textsf{₹} 1878.75$

... (iv)

The total electricity bill amount for the month is $\textsf{₹} 1878.75$.


Example 2 (Water Bill Calculation). A household consumed 18 kl of water in a billing cycle. Calculate the water bill using the following details:

  • Water Tariff:
    • 0-8 kl: $\textsf{₹} 4$ / kl
    • 9-15 kl: $\textsf{₹} 7$ / kl
    • Above 15 kl: $\textsf{₹} 12$ / kl
  • Fixed Meter Rent: $\textsf{₹} 60$
  • Sewerage Charge: 50% of Water Charge
  • Assume no other charges, arrears, or late fees.

Answer:

Given:

  • Consumption = 18 kl
  • Water Tariff Slabs and Rates as provided.
  • Fixed Meter Rent = $\textsf{₹} 60$
  • Sewerage Charge = 50% of Water Charge

Step 1: Calculate Consumption

Consumption = 18 kl (Given)


Step 2: Calculate Water Charge (using Slab Rates)

The total consumption of 18 kl falls across all three slabs.

  • First 8 kl are charged at $\textsf{₹} 4$ per kl.
  • $8 \text{ kl} \times \textsf{₹} 4/\text{kl} = \textsf{₹} 32$

  • The next slab is from 9 kl to 15 kl. This range covers $15 - 8 = 7$ kl. These 7 kl are charged at $\textsf{₹} 7$ per kl.
  • $7 \text{ kl} \times \textsf{₹} 7/\text{kl} = \textsf{₹} 49$

  • The remaining kl are above 15 kl. Total consumption is 18 kl. Kilolitres charged in previous slabs are $8 + 7 = 15$ kl. Remaining kl = Total Consumption - Kilolitres in previous slabs

    $Remaining \text{ kl} = 18 \text{ kl} - 15 \text{ kl} = 3 \text{ kl}$

    These 3 kl are charged at $\textsf{₹} 12$ per kl.

    $3 \text{ kl} \times \textsf{₹} 12/\text{kl} = \textsf{₹} 36$

Total Water Charge = Sum of charges from each slab

$Total \text{ } Water \text{ } Charge = \textsf{₹} 32 + \textsf{₹} 49 + \textsf{₹} 36 = \textsf{₹} 117$

Total Water Charge = $\textsf{₹} 117$

... (v)


Step 3: Add Fixed Meter Rent

Fixed Meter Rent = $\textsf{₹} 60$ (Given)


Step 4: Calculate Sewerage Charge

Sewerage Charge is 50% of Water Charge.

$Sewerage \text{ } Charge = 50\% \times \text{Total Water Charge}$

$Sewerage \text{ } Charge = 0.50 \times \textsf{₹} 117$

$0.50 \times 117$

$\begin{array}{ccccccc}& & & 1 & 1 & 7 \\ \times & & & 0 & . & 5 & 0 \\ \hline & & & 0 & 0 & 0 \\ & 5 & 8 & 5 & \times \\ \hline & 5 & 8 . & 5 & 0 \\ \hline \end{array}$

Sewerage Charge = $\textsf{₹} 58.50$

... (vi)


Step 5: Calculate Total Bill Amount

Total Bill = Water Charge + Fixed Meter Rent + Sewerage Charge

$Total \text{ } Bill = \textsf{₹} 117 + \textsf{₹} 60 + \textsf{₹} 58.50$

$117 + 60 + 58.50$

$\begin{array}{ccccc} & 1 & 1 & 7 . 00 \\ & & 6 & 0 . 00 \\ + & & 5 & 8 . 50 \\ \hline & 2 & 3 & 5 . 50 \\ \hline \end{array}$

Total Bill = $\textsf{₹} 235.50$

... (vii)

The total water bill amount for the billing cycle is $\textsf{₹} 235.50$.


Summary for Competitive Exams - Utility Bills

Purpose: Calculate total cost of utility services (Electricity, Water, Gas) based on consumption and various charges levied by service providers and government authorities.


Common Components:

  • Usage/Consumption: Quantity of resource consumed (kWh for electricity, kl/m³ for water, SCM/MMBTU for gas). Calculated as
    $ \text{Current Reading} - \text{Previous Reading} $.
  • Tariff/Variable Charge: Cost per unit of consumption. Often uses Slab Rates, where rate increases with consumption volume (Progressive). Calculated by applying respective rates to units within each slab.
  • Fixed Charge: Constant charge per billing period regardless of consumption (Meter Rent, Customer Charge, Demand Charge).
  • Surcharge: Additional charge, often variable (e.g., Fuel Adjustment Charge/FAC/PPAC in electricity based on consumption or energy charge; Sewerage Charge in water based on consumption or water charge).
  • Taxes/Duties: Government levies (e.g., Electricity Duty, Water Cess, GST on specific components). Calculated as rate per unit or percentage of other charges.
  • Other Adjustments: Arrears (previous dues added), Late Payment Surcharge (penalty for delay), Rebates/Subsidies (reductions, often for low consumption).

Calculation Process (General):

  1. Determine total consumption from meter readings.
  2. Calculate the variable charge (Energy/Water/Gas Charge) by applying the appropriate tariff rates to the consumption, splitting consumption into slabs if necessary.
  3. Add all fixed charges.
  4. Calculate and add any surcharges based on rules (per unit, percentage, etc.).
  5. Calculate and add any taxes/duties based on rules.
  6. Sum all calculated charges to get the Gross Bill Amount.
  7. Adjust for Arrears, Rebates, and LPSC to get the Final Amount Payable.

Key Skill: Accurate application of slab rates to the correct portions of total consumption. Understanding the basis of calculation for each charge (fixed, per unit, percentage).